Lighter Quay Hotel and Apartments
Upper Harbour Bridge
Wellington Railway Station Seismic Strengthening
Central Motorway Junction
Auckland War Memorial Museum
 

Project: Lighter Quay Hotel and Apartments

Date: February 2006

Location: Auckland

Architect: Peddle Thorp Aitken

Engineer: Holmes Consulting Group

Concrete Supplier: Stresscrete

Reason for choosing SCC: Stresscrete recommended the use of SCC because of the congested reinforcement in the integral beam-column joints, and the need to get a good architectural finish on the complex shapes.

Type of unit: Precast perimeter beams with integral beam-column joints and cantilevered balcony.

Outcome:  A very good surface finish was achieved and the concrete flowed easily through the reinforcement.

Submitted by:  Sherif Okba, Stresscrete